Metal buildings are assembled on site by professional installers. Ask us about the configuration and installation plan for your project.

Scheduling is project-specific. We will confirm timing and installation details as your order progresses.

Unfortunately, we do not provide any interior finishing options, such as electrical, plumbing, insulation, drywall, etc. Customers will often make additions, customize or “finish out” their buildings in various ways once paid for and delivered, but we recommend that you hire an experienced contractor to do this work since improperly done finishing work can cause a safety or fire hazard or cause damage to your Old Hickory building and therefore void aspects of the warranty.

Permit requirements vary by location, building type, size, and intended use. Check with your local planning or permitting authority before ordering; the property owner is responsible for obtaining required permits.

Choose a square, level site and complete needed grading, foundation, or surface work before installation. Serious Sheds does not perform site preparation.

Metal buildings are assembled on site. Please provide clear access and working room around the structure; check for underground utilities where anchoring is planned and keep at least 10 feet clear of overhead power lines. Contact us early if access is limited.

Installation duration depends on the building, site conditions, weather, and configuration. We will confirm the expected schedule for your specific project.